Steam tariff, electrification study, hybrid comparison, LPG conversion or a cylinder for your kitchen — send the essentials below and an engineer (not a call centre) responds within two working days with an indicative tariff and next steps.
Per-ton steam pricing for biomass, gas or hybrid thermal-as-a-service on your site.
Use the form belowElectric vs biomass vs hybrid comparison with renewable PPA pricing and a carbon model.
About electric boilersFuel suppliers, transporters, fabricators, switchgear and renewable-power partners.
Register as a vendorEngineers, operators, IoT/ML and sales — Hyderabad HQ, field roles and Frankfurt.
See open rolesThe more we know about your load, the sharper the first answer. Steam demand and current fuel are the two numbers that matter most.
Clear Energy Limited
H.No. 3-7-63/79, Sai Sapthagiri Colony
L.B. Nagar, Hyderabad — 500068, India
App issues, leak emergencies, deposit refunds and account help.
EU enquiries, OEM partnerships and European thermal-SaaS and electrification contracts — same engineering team, same email.
Response promise: an engineer replies within 2 working days — never a generic acknowledgement.
A thermal or electrical engineer reviews your load and replies with an indicative per-ton tariff range — or the two or three questions needed to produce one.
A no-obligation walk-through of your boiler house, fuel logistics, electrical connection and steam distribution. Usually half a day on site.
We model biomass, electric-renewable, H₂-ready gas and hybrid options against your load profile — with firm tariffs, carbon numbers and a recommendation.
A take-or-pay tariff with availability SLAs, fuel pass-through transparency and zero CAPEX on your books. From signature, greenfield sites commission in 6–9 months.
Engineering, fabrication, fuel supply chain and 24/7 operations control. Active installations in 17 states and counting.
EU customer contracts, OEM engineering partnerships and our entry point into European chemicals and food clusters.